Gold Member Since 2016
Joymall (Tianjin) Science and Technology Development Co., Ltd.

Steel Formwork, Cuplock, Formwork manufacturer / supplier in China, offering Steel Scaffolding Cuplock System Scaffold for Construction, OEM Heavy Duty Ductile Iron Manhole Cover, Customized Zamak Lock Part Zinc Alloy Lock Part Aluminumlock Part and so on.

(/ )

Supplier Homepage Product Scaffolding and road facility Steel Scaffolding Cuplock System Scaffold for Construction

Steel Scaffolding Cuplock System Scaffold for Construction

FOB Price: US $1.43-1.62 / Piece
Min. Order: 1,000 Pieces
Min. Order FOB Price
1,000 Pieces US $1.43-1.62/ Piece
Get Latest Price
Production Capacity: 100000000PCS/Year
Transport Package: as Customers′ Requirement
Payment Terms: L/C, T/T, D/P, Western Union, Paypal, Money Gram

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: CPS003
  • Type: Fixed
  • Framework: Combined Scaffolding
  • Lapping Form: Full Scaffolding
  • Move Method: Attached Lifting Scaffolding
  • Construction Properties: Building Scaffold
  • Surface Treatment: Painted, Galvanized, Powder Coating, or Customized
  • Size: as Per Requirement
  • Pipe Diameter: as Per Requirement
  • Specification: customized
  • HS Code: 73084000
  • Material: Steel
  • Structural Style: Multi-Pole Scaffolding
  • Supporting Mode: Floor Type Scaffolding
  • Erection Position: External Scaffolding
  • Scaffolding Part Type: Scaffolding Props
  • Color: as Per Requirement
  • Export Markets: Global
  • Pipe Thickness: 1.8mm-4mm
  • Trademark: Joymall or OEM
  • Origin: China
Product Description
Joymall (Tianjin) Science and Technology Development Co., Ltd. (Herein after referred as Junmao)'s predecessor began the business in 1991s. With more than 25 years' experience, Junmao has one 5500m2 factory, two branches offices and one affiliated company in Tianjin, China. All products pass the RoHS, SGS inspection.


Specification of Scaffolding:
NameScaffolding
Surface TreatmentHot dip galvanized, Galvanized, Zinc plated, Powder coated, Dip painted, Painted
ColorSilver, Orange, Red, or as your request
ServiceOEM service available
MOQ1*20GP
PaymentT/T, L/C
Delivery TimeAbout 15-30 days after confirmation
PackingIn bulk, steel pallet or as your request
Production Capability100 tons per day
Manufactory LocationTianjin, China
Test:SGS, BV or as per your request
 
 
 
NameSizeMaterialTube size
Vertical Standard1000mmQ345 Steel or Q235 SteelΦ48.3*3.2mm
1500mm
2000mm
2500mm
3000mm
Ledger600mmΦ48.3*3.0mm
900mm
1000mm
1200mm
1500mm
1800mm
2000mm
Base Jack600mmΦ38*4.0mm
 
You may also interested in Frame Scaffolding System, Steel Prop Scafolding System, Cuplock Scaffolding System, Ringlock Scafoolding System, Plank Serious, Scaffolding Accessory, Beam and Steel Formwork, please contact us.
 
Send your message to this supplier
Avatar
Mr. LI
*From:
To: Mr. LI
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now